Category: Public Works

Town seeks bids for 2024 Fairfax Slurry Seal and Road Improvement Project

Bid Submission Town of Fairfax (“Town”) will accept sealed bids for its 2024 Fairfax Slurry Seal and Road Improvement Project (“Project”), by or before August 13, 2024 at 3:00 p.m., at its Town Hall office, located at 142 Bolinas Rd, Fairfax, California, 94930, at which time the bids will be publicly opened and read aloud. … Continued

Town seeks bids for 103 Rocca Drive Stabilization and Road Improvement Project

Bid Submission  Town of Fairfax (“Town”) will accept sealed bids for its 103 Rocca Drive Stabilization and Road Improvement Project (“Project”), by or before August 13, 2024 at 2:00 p.m., at its Town Hall office, located at 142 Bolinas Rd, Fairfax, California, 94930, at which time the bids will be publicly opened and read aloud.  … Continued

Notice of Roadwork: Bolinas and Mono Intersection

Date: Monday, June 17th Time: Starting at 8:00 AM, lasting all day Details A section of roadway at the intersection of Bolinas and Mono will undergo pavement restoration work, resulting in a lane closure and traffic impacts for the entire day. Key Points Purpose: The Town is expediting the completion of road restoration work by … Continued

Rockridge Road Drainage Improvements Bid Results

View the bid results Bid Results Rockridge Road Drainage Improvements Project Project improvements includes removal of existing asphalt pavement, earthwork grading, clearing, grubbing, traffic controls, utility location, and installation of storm drain drop inlets, saddle catch basin, storm drain pipe, trenching, backfilling, and hot mix asphalt pavement as indicated in the plans and these specifications. … Continued

Winter Storm Update – February 5, 2024

Rain is expected to continue throughout the week. National Weather Service has issued the following advisories: Flood Warning until February 5, 07:00 PM PST Coastal Flood Advisory in effect from February 6, 06:00 AM PST until February 10, 10:00 AM PST Town of Fairfax, RVFD, and County staff and equipment are communicating and are prepared … Continued

Prepare for heavy rains and strong winds Wednesday, January 31

Weather storm points to heavy rainfall and strong winds impacting Marin. Today is the last chance to clear leaves and debris from gutters and storm drains. There is high confidence of 4-6” totals across the County within 24 hours starting Wednesday morning. Gusty winds of 35-50 mph may cause down trees resulting in power outages. … Continued

Town seeks bids for Rockridge Road Drainage Improvements

Rockridge Road Drainage Improvements Project Project improvements includes removal of existing asphalt pavement, earthwork grading, clearing, grubbing, traffic controls, utility location, and installation of storm drain drop inlets, saddle catch basin, storm drain pipe, trenching, backfilling, and hot mix asphalt pavement as indicated in the plans and these specifications. Addendums Addendum No. 1 Addendum No. … Continued

Time to maintain creeks and drainage on your property

With the rains starting in Fairfax, it’s a great time for property owners to ensure their creeks and drainage systems are in good shape. These waterways are crucial for storm drainage and flood control. Property owners should inspect and maintain their creek portions, including clearing debris, vegetation, or other blockages that could hinder water flow. … Continued

Town seeks bids for street sweeping services

The Town of Fairfax is issuing a Request for Qualifications to provide Street Sweeping Services to qualified contractors that can provide the requested service. The qualified contractor will be expected to provide street sweeping services to approximately 16.5 miles of Streets and Roads within the Town of Fairfax, although the exact mileage and streets may … Continued

Close window